How Lazarev.agency's redesign doubled Fusion Power's daily client capacity

About the project

Fusion Power installs solar panels across the US, running every job from lead generation through documentation and installation. Those four stages lived across separate tools. Information dropped between departments and projects waited on handoffs. Capacity was capped by coordination, even though crews and demand had room to grow.

Here's how Lazarev.agency redesigned Fusion Power's platform, doubling the number of clients served daily.

2x

increase in the number of clients served daily.

2.4h

of daily work time saved by streamlining project handoffs between departments.

Faster daily coordination across thousands of workers

Fusion Power's operations ran across five disconnected tools. Lazarev.agency consolidated them into one platform where onboarding and training modules prepare new employees, a task system delegates work across thousands of field workers, and a built-in messenger carries every project conversation.

As a result, coordination no longer depends on someone remembering which tool holds the answer. Fusion Power now serves twice as many clients per day with the same workforce.

Fusion Power platform showing an email messages inbox with a sidebar and a message list
Rows of solar panels catching sunlight at a close angle
Solar platform dashboard with line charts, donut charts, and bar graphs across a light layout
Solar panel array with the sun setting behind it

New hires reach productive work on practice projects

Fusion Power hires continuously to keep pace with its growth, and every new employee needs extensive training. Our team built a dedicated onboarding section into the platform, where new hires work through simulated projects modeled on real jobs. Mentors follow progress and correct course through the same messenger the team uses daily.

Chat with mentor panel showing a message thread with attachments and a reply field
Angled solar tracker panel mounted on a frame against a clear blue sky
Installer in a hard hat and hi-vis vest fitting a solar panel
Project table tracking task statuses across columns, with colored status labels per row

Less travel time, more jobs finished per crew

Hundreds of Fusion Power employees pick up new jobs daily across wide service areas, where a badly ordered route costs hours of driving. Lazarev.agency built task sorting into the platform, weighing client schedules, employee location, and priority level together. Crews take the highest-priority job closest to them. Driving time drops and crews fit more installations into the same working day.

Four task cards with assignees, due dates, and status labels, two flagged in red
Two workers in hard hats and hi-vis vests crouching on a solar panel array, seen from above
Project timeline with colored task blocks laid across a calendar grid and a sidebar

A single project record to end handoff delays

Before the redesign, each Fusion Power department worked in its own tool, and every handoff added delay. Lazarev.agency brought all four stages onto a single project page, visible to every department in real time. Nothing gets lost between systems, and no one rebuilds a record already filled in upstream. Fusion Power recovered 2.4 hours of work time per employee each day from those handoffs alone.

Projects list with status labels, client names, and assigned team member avatars per row
Message composer with recipient fields, a formatting toolbar, and a scheduling panel

Faster replies from one project inbox

Fusion Power teams reached each other by email, SMS, and several messaging apps, so a question about a job could sit unanswered while people checked the wrong channel.

We built a centralized Inbox into the platform, collecting every message tied to a given project or task. Attachments, approvals, and status updates stay filed under the job they belong to. Field crews and office staff find a job's full thread in seconds, and no message goes missing between apps.

Fusion Power email view with a sidebar, message list, and an opened thread with attachments
Two people in hard hats reviewing documents in front of a solar panel array

Frequently asked questions

Common questions
about this topic

How can platform unification improve operational efficiency in solar installation companies?

Lazarev.agency built a single platform for SolarDrive that unified lead generation, documentation, permitting, and installation stages. This eliminated communication gaps from using five different tools, streamlining workflows and doubling client capacity.

What are the benefits of centralizing project communication?

We centralized all project communications into one inbox for SolarDrive, enabling faster response times and better team coordination, which significantly reduced errors and saved valuable work hours.

How does task sorting by priority and location enhance team productivity?

Implementing task sorting helped SolarDrive teams focus on the most urgent and nearby jobs first, optimizing resource allocation and shortening project timelines.

Why is integrating project history important for managing complex workflows?

SolarDrive’s new platform consolidated the entire project history on a single page, allowing teams to access past data easily and make informed decisions quickly, reducing delays caused by information silos.

How much work time can be saved by streamlining workflows with a unified platform?

By consolidating multiple tools into one platform, SolarDrive saved approximately 2.4 hours of daily work time per employee, boosting overall efficiency and capacity.

How does simulating real projects during development improve platform usability?

Lazarev.agency simulated actual SolarDrive projects to test and refine the platform, ensuring it matched real operational needs and provided intuitive user experiences from day one.

What impact can platform unification have on client capacity for solar installation businesses?

Thanks to the unified platform, SolarDrive doubled its client capacity, allowing the company to handle more projects simultaneously without sacrificing quality or efficiency.

More cases like this

Related cases you
might find useful

SaaS

AI

September 30, 2026

How we helped Accern design an AI research product that powered $40M growth and acquisition

Discover how we helped Accern build a powerful AI research tool for analysts and VCs, setting new UX standards now used by AI leaders across industries.

View case
A glassy 3D model of an AI robot

SaaS

AI

September 29, 2026

How Lazarev.agency helped Dynascale attract new leads and build an engine for profit growth

See how Dynascale overcame growth challenges with strategic brand revamp & enterprise-grade UX by Lazarev.agency.

View case
Dynascale branding visual: a technician holding a laptop in a blue-lit server room, with the "Dynascale" logo centered.

AI

September 27, 2026

How we helped a complex AI SRE tool website boost customer acquisition

See how Lazarev.agency transformed Bacca AI's complex tech into a compelling story that boosts SRE platform sales.

View case
Laptop in dark lighting showing the Bacca.ai homepage for an AI SRE tool, with a chat-style interface panel.

Let's talk about your AI adoption challenge

Tell us where adoption stalls. You’ll hear back from a senior product and UX lead with a practical action plan.

Response within one business day

Talk to us
Explore our services
Black background with a subtle pattern of tiny evenly spaced gray dots forming concentric oval shapes radiating from the center.

Let's make AI your strength

Let's talk about what you're building

“Through a detailed understanding of the client’s platform, Lazarev. was able to create a clean and intuitive UI/UX design that ticked all the boxes. The team was receptive to all requirements and requests and adapted well to timeline changes. They produced accurate mockups at every iterative stage.”

Smiling man with beard and short hair in a round black-and-white photo.
Nick Chapman

Founder at Pika AI

Attach your brief in PDF or DOC. Skip anything under NDA.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Send

Your details are used only to respond to you with feedback tailored to
your case. See Privacy Policy

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.